Road Crack Sealing Work Begins April 18
4/18/2012 -
Road Crack Sealing Work Begins Today
Crews to seal cracks in major arterials and residential areas to extend lifespan of the street
PORTLAND, Maine – Beginning today, April 18th and continuing through the month, crews will begin day and nighttime crack sealing along major arterials and residential streets throughout Portland. Work on residential streets will be done during the day and major arterials work will take place overnight. Crack sealing utilizes a rubberized petroleum-based material that fills in the separation gaps typically found on pavement. This repair work extends the overall lifespan of the street and is an effective cost-saving measure. If left unchecked, water and debris can infiltrate these cracks and cause a great deal of damage due to frost and settling. While the work is underway, commuters can expect delays.
###