Traffic Control Plan Information

Traffic Control Plan Required Information
  • Must clearly depict the planned excavation area.
  • Must clearly show the routing of traffic, both vehicular and pedestrian, around the work zone and if a detour is required it must show the entire planned route.
  • Must show all placement of safety signs and traffic cones to be used within the work zone. All traffic control devices should follow the MUTCD Standards of Temporary Traffic Control Devices.
  • All affected ADA crossings need to be maintained or rerouted to appropriate ADA access.
  • Maine MDOT Road Classification Map
  • Variable Message Boards shall be used to notify the public in advance of major construction impacts. They shall be used in areas that are congested or challenging and for all lane closures and should be shown on the TCP.
fig6h_10_sm
fig6h_29_sm
fig6h_27_sm